- Pressure washing the Aquatheater
- Renovating Ballfield #3 to grass to reduce the need for maintenance and improve safety, for t-ball and casual use
- Adding cobblestones to the parking lot shrub beds at Green Lake Community Center to improve sidewalks and reduce the size of the beds, reducing the need for maintenance
- Reducing the size of the Bathhouse Theater shrub bed and improving the irrigation
- Mulching tree groves around the lake to reduce the need for maintenance
- Painting the stripe on the interior Green Lake path
- Fixing a drainage problem to eliminate standing water on the path
- Replacing signs
Discover more from Wallyhood
Subscribe to get the latest posts sent to your email.